Town Projects

Each year, Council approves a variety of town projects aimed at maintaining and improving services for the residents of Perth. These projects focus on enhancing infrastructure, public facilities, and the overall quality of life in our community. Below is a list of the approved projects for 2024.

Roads/Water/Sewer

Project

Description

2012 Chev 1/2 Ton Replacement of vehicle
Cockburn Street Upgrades Reconstruction in Summer of 2024 with full reconstruction of infrastructure
Drummond St Pedestrian Rehabilitation Rehabilitation of small pedestrian bridge on Drummond Street
Engineering Road Work Assembling library of reconstruction projects and designs ahead of the tendering of road projects
Hwy 7 Water & Sewer Study Design of Water, Sanitary, and Storm Sewer networks in preparation for the reconstruction of Highway 7 by the province
Infrastructure Master Plan  
Library Parking Lot Grading improvements, resurfacing, and optimizing usage
Little Tay Bridge - Design Evaluation and maintenance of Double Arch Stone Bridge on Gore Street
Mary Street Upgrades Sodding to be completed Spring 2024, paving to be completed Summer 2024
Museum Parking Lot Grading improvements, resurfacing, and optimizing usage
Perkins Genset Generator 1999 Jamesville Pumping Stn 100 KW Replacement of backup power system
Road Line Painting This is an annual activity to paint road lines including parking spaces, loading zones and handicapped spaces
Road Crack Sealing This is an annual activity to seal cracks in the roads
Scada Software Upgrade On-going maintenance Water Treatment Plant operating hardware and software
Sewage Lagoon  Structure replacement
Sewage Lagoon Sludge Removal Multi-year activity to maintain wastewater treatment capacity. Required every 8 to 10 years
Sewage Lagoon Structure Maintenance of control structures at the Wastewater Treatment Facility
Storm Sewer - Rural Ditching Maintenance Annual cleaning of municipal ditches
Thom Street Upgrades Reconstruction in Summer of 2024 with full reconstruction of infrastructure
Tree Replacement Downtown Replacing the trees that were removed in 2022 due to the Emerald Ash Borer disease
Treelawn Sidewalk New sidewalk to facilitate pedestrian movement, active lifestyle
Water Treatment Plant Floc Tanks Maintenance of mechanical system at the Water Treatment Plant
Water Treatment Plant Reservoir Valves Replacement of the valves and actuator

Development

Project

Description

Development Charge Study This is a regular activity to update the Development Charge study with current information
Official Plan Review Review of the Town's Official Plan
Updates to the Official Plan and Zoning By-law Review and cross-check of these two documents, with updates to Zoning By-law to ensure cohesiveness

Fire/Protective Services

Project

Description

Emergency Preparedness Exercise The Emergency Response team will conduct a simulated emergency to practice the response

Buildings

Project

Description

1881 Rogers Road Flooring replacement
Community Centre Change Rooms Floor and shower replacement in change rooms #4 & 5
Community Centre Multi-Purpose Room Renovation of space
Environmental Services Garage Repairs to the existing garage and planning for upgrades
Indoor Pool Alarm & Lighting Replace fire alarm system and LED lights
Indoor Pool Hot Water Heater Replacement of two hot water heaters
Infill of Crystal Palace Roof This will involve removing the aged glass panels on the roof and replacing with an infill roof
Perth Museum Window scraping and painting
Visitor Information Centre Upgrades Flooring replacement and drywall repair/replacement
Water Treatment Plant Roof replacement

Parks/Recreation

Project

Description

Conlon Farm Tennis/Pickleball Courts Upgrades to courts 3 and 4
Darou Farm Implementation of Darou Farm Working Group
Mill Street Playground Replacement of play structures - received an Ontario Trillium Grant
Perthmore Park Installation of picnic shelter and swing set

Tourism/Economic Development Projects

Project

Description

Economic Development Initiatives Implementation of Economic Development Marketing Plan
Perth Night Market Perth Night Market on Sept 14
Social Media Implementation of 2024 Tourism Social Media Content Plan
Streetscape Upgrades Upgrades to downtown including new trees, holiday lights, and signage
Tourism Packages Creation of experiential tourism packages for Perth Museum

Other

Project

Description

Active Transportation Plan Completion of an Active Transportation Plan
Climate Change Implementation of Climate Change Advisory Panel initiatives
Community Centre Ice Maintenance Purchase of new Olympia Ice Resurfacer
Community Engagement Initiatives Implementation of Social Pinpoint, a community engagement platform
Salary Grid Review  